home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / SPACEDIG / V12_5 / V12_522.TXT < prev    next >
Internet Message Format  |  1991-06-28  |  17KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/obCvBkO00VcJA4=052>;
  5.           Sat, 10 Nov 1990 02:59:44 -0500 (EST)
  6. Message-ID: <MbCvBG600VcJ449E4g@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sat, 10 Nov 1990 02:59:15 -0500 (EST)
  12. Subject: SPACE Digest V12 #522
  13.  
  14. SPACE Digest                                     Volume 12 : Issue 522
  15.  
  16. Today's Topics:
  17.        Re: You Can't Expect a Space Station to be Cheap
  18.                Re: Spell u-l-y-s-s-e-s
  19.            Re: Ulysses speeding up rel. to the sun
  20.            Re: Galileo Update #2 - 11/01/90
  21.  
  22. Administrivia:
  23.  
  24.     Submissions to the SPACE Digest/sci.space should be mailed to
  25.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription notices,
  26.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  27.              tm2b+@andrew.cmu.edu
  28.  
  29. ----------------------------------------------------------------------
  30.  
  31. Date: 1 Nov 90 18:08:19 GMT
  32. From: hub.ucsb.edu!ucsbuxa!3001crad@ucsd.edu  (Charles Frank Radley)
  33. Subject: Re: You Can't Expect a Space Station to be Cheap
  34.  
  35.  
  36.  
  37.  
  38.   
  39. o
  40. o
  41. >Boeing has a long track record of building highly successful
  42.  >aircraft.   LLNL does not have any track record at all in large
  43.  >space systems.
  44. + First of all, that is irrelevant.
  45.  
  46. It is not irrelevant, track record is the SOLE reason Boeing
  47. receives these kinds of contracts.    Therefore your analogy
  48. there cannot be applied to LLNL.
  49.  
  50. +Second of all, the LLNL contractors on this DO have a good track
  51. +record in large aerospace systems.
  52.  
  53. So do the Freedom contractors.......
  54.  
  55. >At what point do you decide it does not work.
  56. +That is a fair question. Let's see... Freedom was to be done in
  57. +six years and cost 8 billion. Instead it will take 20 years and
  58. +over 40 billion which is 2.5 times as long and five times the
  59. +cost
  60.  
  61. Don't you think LLNL will go through similar cost increases as
  62. reality starts to dawn, and the magnitude of the task is truly
  63. appreciated ?   And in the 2 years I have been working Freedom,
  64. first element launch has been set at March 1995, and has not
  65. slipped one day.    And the costs have been reduced, not
  66. increased.
  67.  
  68.  +If LLNL doesn't have an Earth Station in orbit four years after
  69. + start costing under $4 billion I will call for it to be killed.
  70. + How's that?
  71.  
  72. That's OK provided Freedom does not get cancelled in the interim,
  73. then we get nothing.
  74.  
  75. +Interesting choice of numbers. Freedom was to be ready in about
  76. +six years with the start of operations next year. We have
  77. +already spent six years with nothing to show for it (not
  78. +counting the $8 billion in briefing slides that is).
  79.  
  80. Progress is greater than you think.   Breadboard hardware has
  81. been built and tested, and we are moving into Engineering
  82. Development units.    Manufacturing drawings are being released,
  83. although probably not in their final form.  Flight software
  84. specifications have been written, and coding will start in a
  85. matter of months (not sure exactly - not my area).   Flight
  86. article metal bending will begin in 1992 and deliveries of flight
  87. articles will begin in 1993.  March 1995 first element launch
  88. date has been unchanged for the last two years.
  89.  
  90. +That is not the problem. A 10% cut is enough to send all of
  91. +Freedom back to the drawing board. That is bad project
  92. + management. Projects I have managed have taken harder hits
  93. + without tossing everything out.
  94.  
  95. All of Freedom is not sent back to the drawing board, the area I
  96. am working on has so far been affected little.   And nobody is
  97. "tossing everything out", where did you hear that ?
  98.  
  99. + Besides, sources on Freedom say that the budget cuts are the
  100. + excuse  not the cause of the redesigns.
  101.  
  102. Redesigns would have been necessary with or without budget cuts,
  103. but the cuts have made them more often and more severe.  And the
  104. fact that the redesigns have been for political and not technical
  105. reasons has been very bad for morale.
  106. >   Proposing untried NiH batteries which have no advantage over
  107.  >existing ones;
  108. + These batteries provide more power for less weight. This
  109. +results in cost savings which most people think is an advantage.
  110.  >proposing untried amorphous silicon cells with
  111.  >dubious qualification prospects and admitting conventional
  112. > cells woulBd be just as good and less risky;
  113.  
  114. But the NiH and solar celss are not space qualified, and they
  115. underestimate the qual costs, which could wipe out the saving.
  116. And they may never pass qual.  It could be a valid R & D program,
  117. I simply object to LLNL trying to sell it as being cheap and off
  118. the shelf.
  119.  
  120.  >presupposing a brand new
  121.  >ELV will be ready on time in three years and cost next to
  122.  >nothing; - all this I find hard to swallow.
  123.  +
  124.  +Tell us what part is hard to swallow? Have you read up on them?
  125.  +MDAC and Martin Marietta say it can be done. What do you know
  126.  +that they don't? You spoke above about Boeing and how they
  127. + could estimate cost because they had a track record. Don't
  128. + these +companies also have a track record?
  129.  
  130. + But again, none of these are serious problems. If they work, we
  131. +advance the state of the art and save money. If they fail, their
  132. +weight budgets and schedules allow for it.
  133.  
  134. No it is worse, if they fail and Freedom is cancelled, we waste
  135. decades, it will take that long to rebuild a manned space
  136. program.
  137.  
  138.  
  139. + A NASA contractor and NASA both say it will work. I think it is
  140. + safe to say that both are up on the relevant standards and
  141. +laws.
  142.  
  143. Fair enough.
  144.  
  145. > station cannot go up in the HLV with the crew following in the
  146. > Shuttle or on a (safer and cheaper) Delta.
  147.  
  148. Oh come on, the Delta is an unmanned ELV, there are no manned
  149. spacecraft designed to fly on delta.   And developing a new
  150. manned spacecraft is not cheap.  Don't tell me that has been
  151. factored into the cost too.
  152.  
  153. + You miss the point. If the HLV is not available they can launch
  154. + the Earth Station on a Titan. Freedom was deliberately designed
  155. + to use ONLY the Shuttle. The LLNL plan allows for failure but
  156. + Freedom does not.
  157.  
  158. But again, Titan is expensive, no cheaper than shuttle.   Don't
  159. tell me they have included costs of Titans in their plan.  This
  160. really is getting very far fetched.
  161.  
  162. + It is only good engineering to have a backup for all the
  163. +methods and technology you plan to use. I always do.
  164.  
  165. I agree 100 %, no 1000 %.    It is the COST I am disputing, not
  166. so much the technical approach.
  167.  
  168.  >+ If the HLV is gounded, they could use Titan, Delta, or even
  169. + the Shuttle.
  170.  >Sure, but then their cost projections go out the window, and
  171. > you end up with a system costing the same as Freedom.
  172. +  No because the alternatives they use are all much cheaper than
  173. + the Shuttle.
  174.  
  175. Wrong again.   Titan is no cheaper than Shuttle.    Delta is too
  176. small too launch the LLNL package, so requires a complete
  177. redesign which cancels out the launch cost saving.
  178.  
  179.  >Adapting launch packages to fit three or four different
  180. > vehicles sends your cost sky high.
  181. + Not in this case. The HLV fairing and interfaces are all
  182. +compatible with Titan IV. In fact, they both use the same
  183. +fairing and interfaces. A worse case failure will double their
  184. +transport costs which will go from $500M to $1B. See what can be
  185. +done when you have a fallback plan?
  186.  
  187. A single Titan-IV launch gives you a tiny space station.   More
  188. like a MIR than a Freedom.    MIR is a lot cheaper than LLNL.
  189. The whole point of Freedom is its size and capability. LLNL gives
  190. all that away.
  191.  
  192.  + That means there is about a 50% chance that Freedom will never
  193.  +be built. I consider a 50% chance of failure high risk.
  194.  
  195. I will not dispute those probabilities, other people arrive at
  196. different numbers.    The point of failure rate predictions like
  197. that is as an inspiration to work on the causes and fix them.
  198. That is why the number was generated.   You don't just close your
  199. eyes and pray...!   Reliability predictions are design tools, not
  200. forecasts of doom.
  201.  The point is you are not able to quote probabilities for LLNL
  202. because there is no meaningful test data and hence no failure
  203. rate data, so a responsible engineer has to assume high failure
  204. rates until proven otherwise.   For some reason which I do not
  205. understand, you seem to assume the failure rates for LLNL will be
  206. low.   Such "ass-backwards" thinking reminds me of Challenger
  207. "We got away with launching in cold weather twice, so this gives
  208. us confidence we will get away with it again...."   It reflects a
  209. fundamental failure to understand the statistical basis of
  210. reliability predictions, and how to use the numbers generated.
  211.  
  212.  >With one exception, I would like to see an ACRV added to
  213.  >the program to get some independence from the Shuttle.
  214. + How does that make them independant of the Shuttle?
  215.  
  216. It makes the crew in orbit able to get back.   It does not of
  217. course prevent the SSFP from re-entering.
  218.  
  219. + If you want to know how much it costs, you do.
  220.  
  221. I do not understand.
  222.  
  223.  + Well, we do pay interest on the deficit. I think it counts as
  224. +credit.
  225.  
  226. So Freedom costs should be computed to amortize the deficit ?
  227.  
  228.  >+One bad effect of this is that it hurts the domestic launch
  229.  >+ industry.
  230.  >
  231.  >No, it does not.  NASA is prohibited by Executive Order from
  232.  >competing with the commercial ELV industry.
  233.  
  234. +Ah but it does. It takes buisness away and costs the taxpayers
  235. + billions.
  236. Are you saying Freedom should be launched on commercial ELV ?  I
  237. have no real problem with that.   Would require several dozen
  238. Titan-3 launches.  The ELV industry does not have that capacity
  239. right now, would require them to change gear.   But could save
  240. $$$.    Will need to redesign all the Freedom launch packages
  241. however, big cost and schedule hit at this stage in the program.
  242.  
  243.  
  244.  >+ It is cheaper to design for no eva and do eva if needed than
  245. to
  246.  >+ require eva.
  247.  
  248.  >Not really.   Once you provide the airlocks, EVA suits,
  249. training
  250.  >and all, then take it all into orbit, whether you use it or not
  251.  >makes little difference to the final cost.
  252.  + The Earth Station already has an airlock and facilities for
  253. +EVA.
  254.  
  255. I do not mean the Earth station, I mean your mysterious "Delta-
  256. launched" manned spacecraft will have to be designed to support
  257. EVA in order to assemble the Earth station in the event the Earth
  258. Station fails to deploy automatically.    That makes the Delta-
  259. spacecraft expensive.   More than the entire HLV, to put it in
  260. perspective.
  261.  
  262.  >All Moon/Mars funding has been deleted, so how come
  263.  >LLNL think they are going to get congress to change their minds
  264.  
  265. + They already have. The House Senate Conference put back the DoE
  266. + IR&D money. Some of this money will go to the Great Exploration
  267. + for A detaild study. After that, there is good reason to expect
  268. + them to start in earnest. This probram has the support of the
  269. + Space Council (Quale recently told the head of LLNL that he
  270. + wanted to see this program move forward).
  271.  
  272. I am delighted.   I just hope Quayle and the congress won't be
  273. too disappointed when they see the cost projections escalate
  274. and/or the schedule start slipping, happens to everybody sooner
  275. or later.
  276.  
  277. +I would like to see a reason more detailed. What specific
  278. +engineering problems are there?
  279.  
  280. I do not know.   That is the problem in itself.  They express
  281. extraordinary optimism about an unknown quantity.    Maybe it
  282. will work.    It is simply psychological, I was always taught not
  283. to count your chickens until they are hatched.
  284.  
  285.  > >>Any of those guys coming to southern California any time
  286. soon?
  287.  > >+ Invite them down
  288.  > >Hah !  I value my job too much.
  289.  >+ That's an interesting remark. Why would inviting some
  290. + speakers in get you fired?
  291.  >I work for a Freedom contractor.    LLNL represents the
  292. > competition.
  293. + Now that is another interesting remark. I routinely visit and
  294. +look at the work of my competition. I want to know what they are
  295. + up to and if they have any good ideas.+
  296. +  Why are your bosses so afraid of evaluating the competition?
  297.  
  298. We are of course VERY interested in the competition.   My concern
  299. is giving competitiors visibility of our status, and providing
  300. them a forum.   Meeting on neutral turf is AOK, which is why I
  301. ask: are they coming to So Cal.
  302.  
  303. + BTW, NASA and LLNL recently signed a MOU on this. Both agreed
  304. +to exchange information and ideas. So I think you can do it
  305. + without getting fired.
  306.  
  307. That is very interesting, I did not know that.  In that case it
  308. is highly likely our paths will cross anyway.
  309.    Also, my competitors do net give me the same access to their
  310. facilities as yours do !
  311.  
  312. ------------------------------
  313.  
  314. Date: 31 Oct 90 15:23:50 GMT
  315. From: swrinde!cs.utexas.edu!wuarchive!zaphod.mps.ohio-state.edu!van-bc!rsoft!mindlink!a481@ucsd.edu  (J.D. Frazer)
  316. Subject: Re: Spell u-l-y-s-s-e-s
  317.  
  318. If it's any help, "Ulysses" is pronounced by all of my Classic Literature
  319. instructors at UBC as "You - liss - seas", the way you've always used it.
  320.  
  321. It sounds funny to me if it's pronounced any other way. I'm not sure if there
  322. is a "correct" way to say the word. English lends itself well to abuse and
  323. modification. :-/
  324. --
  325. <-><-><-><-><-><-><-><-><+><-><-><-><-><-><-><-><-><-><-><-><-><-><->
  326. <                        |                                          >
  327. <    J.D. Frazer         | "How can the same shit happen to the     >
  328. < a481@mindlink.UUCP     |  same guy TWICE?!" - Officer John McLain >
  329. <   Vancouver, B.C.      |  in a bad situation; DIE HARD II         >
  330. <      CANADA            |                                          >
  331. <-><-><-><-><-><-><-><-><+><-><-><-><-><-><-><-><-><-><-><-><-><-><->
  332.  
  333. ------------------------------
  334.  
  335. Date: 2 Nov 90 00:05:41 GMT
  336. From: hal!stevem@seismo.css.gov  (Steve Masters)
  337. Subject: Re: Ulysses speeding up rel. to the sun
  338.  
  339. sw@cbnewsl.att.com (Stuart Warmink) writes:
  340.  
  341. >Assume that Ulysses was boosted out of Earth orbit in such a direction
  342. >that it was originally at a tangent to the Earth's orbit - not an
  343. >unusual direction for a boost to the outer planets. If started of in such
  344. >a direction its velocity w.r.t. the Sun would be 0. As Ulysses gained
  345.                                                  ^^^
  346. ...not unless it were launched directly against the earth's orbital velocity
  347. at the earth's orbital speed...Ulysses, upon leaving earth's orbit, was almost
  348. certainly moving close to the earth's orbital velocity (about 18.5 mi/sec,
  349. I think) relative to the sun.
  350.  
  351. This doesn't explain an increase in sun-relative speed...are we sure there isn't
  352. a typo?  Unless there is a gravity assist from Venus, there is no way to get
  353. to Jupiter by dropping closer to the sun (I don't think, anyway :) )
  354.  
  355. Steve Masters    stevem@hal.CSS.GOV
  356. ENSCO, Inc.
  357. Melbourne, FL  32940  USA
  358.  
  359. ------------------------------
  360.  
  361. Date: 2 Nov 90 02:51:31 GMT
  362. From: tristan!loren@lll-winken.llnl.gov  (Loren Petrich)
  363. Subject: Re: Galileo Update #2 - 11/01/90
  364.  
  365. In article <1990Nov2.005551.26294@jato.jpl.nasa.gov> baalke@mars.jpl.nasa.gov (Ron Baalke) writes:
  366. >
  367. >                      Galileo Status Report
  368. >                        November 1, 1990
  369. >     The Plasma Science instrument's protective sun shade on the Galileo
  370. >spacecraft was retracted today as planned.  Preliminary telemetry information
  371. >indicates proper retraction did occur.  Two more delta DOR (Differential
  372. >One-way Ranging) navigation activities were attempted today.  One activity
  373. >using 70 meter antennas in Goldstone and Spain was successful, the other using
  374. >the 70 meter antenna pair in Goldstone and Australia was not due to improper
  375. >predict information at the Goldstone station.
  376.  
  377.     All I can say is that I hope that Galileo is on target for its
  378. first encounter with the Earth, which will be next month. Since its
  379. sunshade is now gone, that means that it cannot go to the distance of
  380. Venus again without getting whatever damage prompted the installation
  381. of that sun shade. I forget what the details of that were all about.
  382.  
  383.     I wonder if the spacecraft's controllers plan to make the
  384. spacecraft take pictures of the Earth during the two flybys. That
  385. might make good press for the program.
  386.  
  387.  
  388. $$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
  389. Loren Petrich, the Master Blaster: loren@sunlight.llnl.gov
  390.  
  391. Since this nodename is not widely known, you may have to try:
  392.  
  393. loren%sunlight.llnl.gov@star.stanford.edu
  394.  
  395. ------------------------------
  396.  
  397. End of SPACE Digest V12 #522
  398. *******************
  399.